Spreadsheet Failure ModeManual Workflow
Root Operational Bottleneck
Customer and tenant deposits sit in a subledger sheet whose refund deadlines are typed from the contract, so the 30-day clock is whoever remembered to look.
Control Hazard & Audit Exposure
Deposits are not returned within the statutory 30-day window because the deadline lived in the sheet and not on the liability record.
Deterministic Software ReplacementClient-Owned Architecture
Dedicated Escrow Deposit Subledger with Statutory Settlement Deadline Triggers
Escrow deposit subledger that stores each deposit with its statutory deadline and triggers settlement when the deadline or release condition is met.
Continuous Assertion Rule
Deadline assertion: an open deposit must have a computed statutory deadline, and a deposit still open after that date is escalated with the remaining hours attached.