Spreadsheet Failure ModeManual Workflow
Root Operational Bottleneck
Qualified research expenses are reconstructed after year end from payroll exports and contractor invoices, so contemporaneous project logs do not exist when the credit study is written.
Control Hazard & Audit Exposure
The IRS exam disallows the credit because time and contractor cost cannot be tied to qualified activities in the period they were incurred.
Deterministic Software ReplacementClient-Owned Architecture
Jira/Git Activity Ingestion & Tax Credit Documentation Engine
Engineering activity feed from issue tracker and source control that tags payroll and contractor cost to qualified projects as the work happens.
Continuous Assertion Rule
Contemporaneous assertion: a credit claim line must cite activity records dated in the same period as the wage or invoice, or it is excluded from the study.